PLEASE NOTE !

If you get lost, or aren't familiar with the interior design of the Great Pyramid
  just click on the   navigation button
always located next to the
relevant text




THE SECOND 1992 CAMPAIGN


All copyrights Rudolf Gantenbrink 1999 
 

 




From here on, it may be interesting to relate the major events of the Upuaut story more or less straight from the notes I kept in my diary at the time.


May 3rd In a meeting in Cairo, Dr. Zahi Hawass agrees to close the pyramid for one week, to preclude accidents due to falling debris while we clear the shafts. Alluding to the loss of tourist revenue resulting from closing the pyramid, Dr. Hawass asks if I can guarantee success in improving the ventilation of the pyramid. Using a reference of significance in the Islamic world, I tell him "I'll give you my right hand on it" and he is satisfied.


May 4th We begin working on the outlet of the upper northern shaft
, directly above the main entrance to the pyramid. As we found in March, the upper southern shaft, because of its steep inclination, is practically free of sand and debris. But the northern one, with a much flatter angle of ascent, requires a major clearing effort.


At a height of 80 meters there is a little opening measuring about 30 by 30 cm. Behind that opening, a tunnel over 11 m long had been dug out along the shaft by unidentified plunderers.


Ulrich Kapp squeezing down through the opening of the "Mankiller"
Tunnel at the outlet of the upper northern shaft.


The tunnel is just big enough - about 70 by 70 cm - to allow one man to squeeze in, but it has been filled up with about four cubic meters of sand, stones and debris, which we have to clear out. Once that backbreaking chore is done, we refer to the tunnel as the "Mankiller," because once anyone forces his way through the narrow entrance, he immediately slides down to the bottom of this dark and narrow chute, caught up in an avalanche of choking dust and stone. Inside, there is little air to breathe but plenty of dirt and grime to swallow.


The "Mankiller" Tunnel before we cleared out the debris and junk.


For security reasons, before we could do any work on the
"Mankiller" we had to clear our daily path to the site.



As we clear the tunnel we also uncover the remains of a previous mission that had failed, probably carried out by Petrie in 1881-82.


We find a badly-corroded, four-wheeled vehicle which would just fit into the shaft. It is made of solid iron and weighs about 30 kg. The very fact that it is still up here convinces me that an earlier attempt to clean out the shaft was made, but if failed. If whoever tried it actually managed to pass the wheeled ram all the way down through the shaft, he would certainly not have bothered to lug this unwieldy beast back up to the outlet.


We discover that the northern shaft is totally plugged, and the find of the vehicle is not encouraging, but at least we know what we have to do. It's obvious that larger stones are jammed in the shaft. As a result, any attempt to push the blockage down from the top will simply compact the debris further, jamming the shaft even more effectively.


The "battering ram" probably left behind by Petrie.


May 5th

We fashion our own, hopefully more effective ram by sharpening one end of a truck axle and welding a large chisel onto it. We carry this 40-kilogram construction up to the entrance to the Mankiller.


There we attach a rope to the rear end of our improvised ram and then send it sliding down the chute. It accelerates for a few seconds and then crashes into the plug of debris, with the desired effect of breaking up the larger stones into smaller pieces, some of which slide down the shaft. But once is not enough.


Only on our third run do we achieve our breakthrough, and hundreds of kilos dust and debris, surrounding our axle, pour down in the Caviglia Tunnel. The interior of the Pyramid is clouded with dust for several hours - but for the first time in at least hundreds of years, the upper northern shaft is clear.


Ulrich Kapp at the end of the Caviglia Tunnel
after we broke through the rubble in the shaft.
The remains of the original shaft can be seen
at the top.



May 6th
We are now ready to make our first attempt to pull UPUAUT-1 up through the northern shaft. We remove the rope from the axle-ram and attach it to the towline - heavy-duty nylon fishing line - of the robot, and then pull the rope back up to the outlet. Then we attach the robot at the bottom end, and begin pulling it up.


But there is still too much sand and gravel in the shaft and the small robot sledge bogs down. The tension on the towline increases until finally it snaps. The sledge, along with another mass of dust, sand and gravel tumbles down to the bottom of the shaft, landing in the Caviglia Tunnel. Luckily the sledge suffers only minor damage.


May 7th
Sandstorm! As immensely valuable time passes I can do nothing but twiddle my thumbs and grit my teeth.


May 8th


We begin by again clearing debris - and a new load of sand left by the storm - out of the shaft and the Caviglia Tunnel.


We fit the "Mankiller" tunnel with a 12 meter long plastic water pipe, which extends outside the upper opening. Then we close up the tunnel with masonry to prevent stones from falling into the shaft.


Wrestling 4-meter sections of plastic pipe 80 meters up the
pyramid's flank is a tricky job.


(At the southern side, we solve this problem by mounting a steel roof over the outlet. The dangerous work on the outside of the pyramid, preparing the ground for the ventilation, requires a total of two weeks.)
Once our clean-up operation is completed we can finally make our next attempt to carry out a full video inspection of the shaft with the towing sledge.


May 9th Our second attempt succeeds! Upuaut-1 covers the entire shaft, from the Caviglia Tunnel at the bottom to the outlet at the top. We measure all the internal joints of the blocks along the way, but discover nothing exceptional. At least we experience no major difficulties. Except of course for the endless jaunts up and down the outer face and in and out of the pyramid - for want of a forgotten pen, or a measuring instrument, or a notebook, etc.


Mohammed and I, proudly, at the finished outlet
of the upper northern shaft.


May 10th
We install metal bars to protect the end of the pipe at the outlet of the upper northern shaft. We also install the electrical wiring from the exterior to the interior of the pyramid, and the electric control panel in preparation for the ventilation system. And we have to re-survey Caviglia Tunnel because we lost the piece of paper with our original measurements somewhere in the dark tunnels.


May 11th
We built the roof over the outlet of the upper southern shaft .



I attach the roof to the non-original stones at
the outlet of the upper southern shaft.


May 12th
We shift to the upper southern shaft and successfully complete the first video inspection of the full shaft, also measuring all the joints.


We establish that both the upper northern and southern shafts have bends in their length axis. This effectively disproves Robert Bauval's "Orion theory." The openings of the shafts are not in line, in other words, from the bird's eye view, they are not parallel to the N-S axis. (see the BENDS 3D drawing at the CYBER DRAWINGS page for details)


And there's a very special surprise awaiting us in the upper southern shaft.
5.9 meters before it reaches the outside the pyramid, the shaft features an arrangement of small niches, like recesses in the wall.
(see the CHEOPS NICHES drawing at the CYBER DRAWINGS page for details)


The niches on both walls of the shaft.
In the center you see the dusty laser rod of UPUAUT-1.
The two laser dots are beamed on the recesses of the niches.


May 13th

I show the video of yesterday's shaft inspection to Dr. Hawass, who is delighted and encouraging. But he remains skeptical about the prospect of improving ventilation in the pyramid.


I modify the camera on the robot to give us a side-view arrangement, so we can inspect those niches more closely.


May 14th We conduct a thorough video inspection of the niches on both sides of the upper end of the upper southern shaft.


May 15th I spend the day chasing all over Cairo to buy the material needed to refurbish the Caviglia Tunnel.


May 16th The ventilators from Germany arrive in Cairo. We are busy constructing the brick wall in the Caviglia Tunnel to fit in the large, two-stage ventilator. We also modify the entrance to the service shaft to improve ventilation.


The ventilator we installed inside the
Caviglia Tunnel.


May 17th
We install the ventilators and the necessary electrical equipment and fittings.


We also survey the exterior of the pyramid, hoping to pinpoint the potential outlets of the lower shafts. My computer analysis indicates that, if they penetrate to the outside, they should do so near the 90th layer. Despite some dangerous climbing and several hours of careful searching from the 80th to 101st layers, we find no sign of any such outlets. For me, this is one of the most intriguing findings of the campaign, because it means that enormous effort went into constructing the lower shafts in such a way as to remain for all time invisible.


I go searching for a possible outlet of the
lower southern shaft.


May 18th
We spend the day working on the ventilation system, conducting operational tests. None of this does any harm to the original structures. I have used a technology to fit in the ventilators without drilling a single hole. We have to attach specially-made, stainless-steel anchors for the security rope. I am forced to guarantee, as the man responsible, that there is absolutely no risk of potentially fatal accidents.


Our test of the new ventilation system is supervised by the still skeptical Egyptian authorities in the person of Mostafa Abd El-Kader Eissa, Director Restoration / Conservation of the Giza Plateau, and three inspectors.


Today's test results: full speed - reduce humidity from 79% to 65% in 30 minutes. Ventilators continue running overnight.


May 19th
Test results:
30% speed. At 12 o clock, 53% humidity - matching the atmospheric value outside the pyramid for the first time in who knows how long!


May 20th
Test results:
30% speed. At 12 o clock, 53% humidity.


May 21st
Test results:
53% humidity.


May 22nd
Test results:
53% humidity. At only 30% of capacity, the new system stabilizes and maintains the atmospheric humidity level!


Prof. Stadelmann urges Ulrich Kapp and me to write up a statement for the press, which we are happy to do. After all, we are very pleased with and proud of our accomplishments.


In a very short period of time we have helped save one of the most important monuments in the world from further damage by humidity. We have also inspected and measured about 120 meters of previously unknown area in the shafts, and have discovered a hitherto unknown element - the niche in the upper southern shaft. We have thus demonstrated that with high-tech, it is possible to explore areas previously regarded as totally inaccessible.


A press conference is scheduled for Saturday 23, my last day in Cairo.


May 23rd
On this Saturday morning I receive a call from Mostafa Abd El-Kader Eissa, who tells me that the press conference has been canceled. He says he does not know why.


Bewildered and frustrated, I pack up and return to Germany.



 


 THE UPUAUT STORY     THE FIRST 1992 CAMPAIGN    THE 1993 CAMPAIGN


 



 THE FINDINGS


 CYBER DRAWINGS


 THE MYSTERY


 THE ROBOTS


 THE TEAM


 THE FUTURE


 PUBLICATIONS


 RECOMMENDED LINKS







DISCOVER THE UNKNOWN
III   CULTURE BY TABAC